very accurately, and have allowed fair prices for the work.
These
plans te formed
the subject of C.5.0. 1.385 of the 7th of Fehnary last.
In July last, shortly after my arrival here, I accompanied the late Surveyor General ver
ground which the
the
Arad was
then proposed to traverse; bit as I could not depend upon the
ccuracy of the
the plane or estimall_ I was obliged for my own entisfaction to prepare those
which I now submit, and which have cost me much time and trouble.
ご
$53
I have laid the road out mot
carefully, in order to obtain the easiest gradients, bebiven the
fomits of junction with the existing roads and also lo have a minimum, quantity of work with the best-roadway What
be given
Can
to the Public.
The amount $51,000 is heavy, but I should not feel justified in matting the road. of a les width, or the works of a less substantial character, in order to reduce the earl --
adir The road will undoubtedly boon to the Colony, than pay for
be a
great
and will more.